Our Projects

Read More >
Proses Pembongkaran Bracket Conveyor (2).jfif

Proses Pembongkaran Bracket Conveyor

Proses Painting Brcket Conveyor (3).jfif
ProsesWlding Bracket Conveyor.jfif
Proses Pemasangan Atap Conveyor (3).jpg

Pemasangan Atap Conveyor

Perbaikan Loading System Batubara Line A ULPLTUD Ketapang

Proses Welding Bracket Conveyor

Proses Painting

Proses Gerinda Brcket Conveyor.jfif

Gerinda Braket Conveyor

 Pekerjaan Jasa Normalisasi Upper dan Lower Bearing Turbin PLTU Ketapang

Proses machining1.jpg

Proses Machining

Proses Babbit1.jpg
Proses UT.jpg

Proses Bubbit Bearing

Proses UT Bearing

Proses Babbit2.jpg
Square Stage

Jasa Pekerjaan Perbaikan Valve Ash Transporter Unit 2 PLTU Ketapang

Proses Pengecekan Dist Valve (3).jpeg
Prses Pengecekan Pressure Valve (5).jpeg

Proses Pengecekan Dist Valve

Proses Pengecekan Pressure Valve

Prses Pengecekan Pressure Valve (3).jpeg

Proses Pengecekan Dist Valve

Pengadaan Bearing Turbin dan Generator Unit 1 PLTU Tanjung Balai Karimun

Proses Machining Turbine Bearing.jpg

Proses Machining

Proses Bubbit Bearing.jpg

Babbit Bearing

Proses MPI Bearing (4).jpg
Proses MPI Bearing (5).jpg

Proses UT 

Pekerjaan Jasa Normalisir Impeller dan Damper PA Fan Unit #2 ULPLTUD Ketapang

Proses Perbaikan Impeller.jfif
Balancing Impeller.jpg
Data Proses Balancing.jpg
IMG-20201208-WA0022.jpg

Proses Perbaikan Impeller

Balancing Impeller

Data Balancing

Proses Perbaikan Demper PA Fan (2).jfif
Proses Rekondisi PA FAn.jfif

Proses Perbaikan Damper PA FAN

WhatsApp Image 2021-09-30 at 15.31.13.jpeg

Pemasangan PA FAN

Inspeksi NGR (2).jpg

Inspection NGR

Pemasangan NGR (9).jpg

Pemasangan NGR

Pemasangan Busduct.jpg
Inspeksi DC Oil Pump (35).jpg
Inspeksi DC Oil Pump (15).jpg
Inspeksi DC Oil Pump (10).jpg
Pemasangan Rangkaian DC Oil Pump (2).jpg

Pegadaan Material dan Jasa Retrofit Panel DC Oil Pump Uit 1 PLTU Ketapang 

Pemasangan Rangkaian DC Oil Pump 

Inspection DC Oil Pump 

Pekerjaan Additional Scope Main Transformer SI Unit 1 PLTU Ketapang

Pemasangan NGR (5).jpg
Pemasangan NGR (1).jpg

Pemasangan Besduct

Petten Grate Br.jfif
Proses Casting Grate bar.jfif

Patern Grate Bar

Proses NDT Grate Bar (2).jpg

NDT Grate Bar

Inspeksi Grate Bar.jpg
Proses Painting Grate Bar (2).jfif

Inspection Grate Bar

 Pengadaan Material Cadang Bar Grate ULPLTU Sumbawa Barat

Casting Grate Bar

Pengecatan Grate Bar

Proses Balancing ID Fan.jpg

Balancing ID Fan

Proses Bending

Proses Bending ID Fan.jpg
Proses Welding.jpg

Proses Welding

 Pengadaan Jasa Fabrikasi Blade ID Fan PLTU Sintang

Proses Balancing ID Fan (2).jpg
Proses Painting ID Fan.jpg

Proses Painting

Head Office

Komplek Pergudangan Taman Tekno Blok H8 No. 10. Kelurahan Setu, Kecamatan Setu, Kota Tangerang Selatan, Banten 15314

021 2943 1988
021 2966 7786

Inquiries

For any inquiries, questions or commendations, please email to ptdmkp@gmail.com

© 2023 by MCR Construction. Proudly created with Wix.com

bottom of page